Balance of Plant for Energy Storage

What we offer


The future of renewable energy is hybrid. To unlock real value, solar must be combined with storage. We make hybrid projects work by delivering BoP for solar and BESS as one profitable package.

What we deliver in Balance of Plant

Pure solar is no longer enough. With energy storage system (BESS = Battery Energy Storage System), a solar park becomes a strong and profitable investment built to last.

Solarigo delivers complete hybrid BoP (Balance of Plant) for both solar and BESS: site works, foundations, electrical infrastructure, and grid connection — everything ready for seamless BESS installation and market integration.

Site preparation and civil works

Foundations and infrastructure

Electrical works and grid connection

Full readiness for BESS container installation

Solarigo in numbers

200+ MWp

delivered solar capacity

10%

of the solar capacity in
Finland is built by us

8.7

client
satisfaction

300+

built large solar
power plants


Latest on solar

Planning a BESS project? Contact us!

Call me – let’s start a discussion!

Erno Syvälahti
Sales Manager, Utility PV

erno.syvalahti@​solarigo.fi
+358 50 449 5003

Contact us via form

This field is for validation purposes and should be left unchanged.
Name*
Newsletter