Finnish renewable energy developer Skarta Energy Oy is building a 5 MWp solar park in Pälkäne. Solarigo Systems Oy is responsible for the design, implementation and initial stage maintenance of the solar park. The solar park will consist of approximately 8,800 double-sided solar panels. The goal of the park is to be completed at the end of 2024.
PANELS
31,000
STEP
CONSTRUCTION
CONSTRUCTION
PÄLKÄNE
CAPACITY
5
Add a Title
Lorem ipsum
Add a Title
Lorem ipsum
Skarta teams up with Solarigo
Solarigo makes a site visit. Skarta chooses Solarigo as the designer, constructor and initial stage operator of the solar park.
09 / 2023
09 / 2023
PROJECT PROGRESS
Design
Solarigo begins the more detailed technical planning of the solar park and the implementation planning of the project. Solarigo makes a site visit.
10 / 2023
10 / 2023
Landscaping
Solarigo begins landscaping works. The area is flattened and dried with drainage.
02 / 2024
06 / 2017
Panel installation
Solarigo begins the solar panel installations.
04 / 2024
04 / 2024
Rack installation
Solarigo begins installing solar panel racks.
03 / 2024
03 / 2024
Commission
Pälkäne's 5 MWp PV park was commissioned on schedule in August 2024.
08 / 2024
08 / 2024
Handover to Skarta
Solarigo delivered an EPC solution and handed the PV park over to Skarta Energy Oy in September 2024.