PÖYRYNWATTILA
SOLAR PARK

PROJECT DESCRIPTION

In Hirvensalmi solar park project, a solar park consisting of 9,000 bi-facial solar panels, approximately 5 MWp in capacity, was implemented on the north side of the municipality's center. The project area was approximately 8.6 hectares in size. The solar park can be utilized as part of Hirvensalmi's climate program. Project company Järvi-Suomen Aurinko Oy has agreed a 20-year land lease agreement for the project area with Hirvensalmi municipality.

Fences and service roads were built around the park. The park does not affect the nearby outdoor trails.

The solar park's investor is Järvi-Suomen Aurinko Oy, which is a project company founded by Suur-Savon Sähkö Oy. Solarigo Systmes Oy acts as an EPC constructor of the park, and the produced solar electricity is sold by Lumme Energia.

PANELS

9200

INVESTMENT M€

~ 3.5

STEP

PRODUCTION

LOCATION

HIRVENSALMI

CAPACITY MWP

5

Add a Title

Lorem ipsum

Add a Title

Lorem ipsum

Development

The north side of the town's center was specified as the project area. In a soil survey, the area was found to be load-bearing and thus well suited for a solar park. An environmental survey was conducted and its results have been taken into account in the implementation. Centre for Economic Development, Transport and the Environment conducted a needs assessment for an environmental impact assessment, which was concluded not necessary for the project.

06 / 2022

06 / 2022

PROJECT PROGRESS

Town zoning

A town zoning change was made for the project, which was available for viewing and commenting on the Hirvensalmi municipality's online service.

02 / 2023

02 / 2023

Public hearing

A public event was held about the project for Hirvensalmi residents on March 21, 2023. The event was attended by residents and representatives of Hirvensalmi municipality, Suur-Savon Sähkö and Solarigo Systems Oy.

03 / 2023

03 / 2023

Construction

The town zoning change, which was a prerequisite for the project's implementation, became legally binding on November 10, 2023. Solarigo Systems Oy made an investment decision on the project and started construction of the solar park in December 2023. A fence and roads were built around the solar park. The surrounding fence is landscaped, so the effect on the overall appearance is minimal. The park does not affect the nearby outdoor trails.

12 / 2023

12 / 2023

Production

Hirvensalmi solar park was put into production on June 26, 2024. It produces approximately 4.5 MWh of renewable solar electricity annually.

06 / 2024

06 / 2024

Solarigo lampaat-4.jpg

Sheep

Solarigo is piloting solar agriculture in Hirvensalmi, where the same area is used for solar electricity production and agriculture. In cooperation with a local sheep farmer, the experiment was found to be successful, and in the future about 100 sheep will be responsible for mowing the solar park during the summer months.

06 / 2024

07 / 2024

DJI_20240826144521_0019_V.jpg

Opening

Solarigo, Hirvensalmi municipality and Lumme Energia organized an opening ceremony for the solar park. At the open-to-everyone event, crepes and coffee were served, the result of the naming contest was announced as "Pöyrynwattila", performances by preschoolers were seen and speeches were heard. In addition, elementary school students visited the park. There were about 200 participants. The participants also got to pet the sheep.

06 / 2024

08 / 2024

MORE INFORMATION

solarigo-timonen_ilja-2022-hires-1975-2small.jpg

ILJA
TIMONEN

Project Manager