THE ATRIA'S SUN

THE ATRIA'S SUN

Between 2017 and 2018, Solarigo implemented a 5.9 megawatt solar power plant called Atria's Sun (Atrian Aurinko in Finnish) to Atria's factory located in Nurmo. The project was a key energy project supported by the Ministry of Economic Affairs and Employment. Atria's Sun initially consisted of 11 separate power plants, two of which were installed on the ground and nine on roofs. In addition, various technical solutions related to solar electricity were piloted in the project starting in 2019, for example a significant size 1 MW electricity storage, which enables participation in reserve and power balancing markets.

Atria's Sun was Finland's first industrial scale solar park. The park was the largest in Finland from 2018 until 2023. The solar system's panel output was almost doubled with an expansion section of 5.0 megawatts in 2023.

The project has received significant coverage on major media platforms during the project's development, installation, commissioning and throughout several following years.

PANELS

31,000

INVESTMENT M€

~ 8.0

STEP

PRODUCTION

LOCATION

NURMO

CAPACITY MWP

10,9

Add a Title

Lorem ipsum

Add a Title

Lorem ipsum

Development

Atria's solar project got its start when the 4-hectare open composting field north of Atria's factory fell out of use, and Atria's supply chain management manager at the time, Tapani Potka, and Solarigo's founding partner Jukka Muilu came up with the idea of using the area to build a large-scale solar power plant.

H2 / 2016

H2 / 2016

PROGRESS OF THE PROJECT

Design

In January 2017, the project received a positive decision from the Ministry of Labor and Economy as an Energy Top Project. The projects investment was to be approximately 6,8 million EUR.

A project company Nurmon Aurinko Oy was founded, which was responsible for the implementation of the project and the delivery of smart electricity use services to Atria with a long-term contract. Atria Suomi Oy and Solarigo Systems Oy are both shareholders in Nurmon Aurinko Oy.

1 / 2017

01 / 2017

Construction

First solar panel installations began in June 2017, and Atria took a step towards its goal of producing low-emission domestic food.

06 / 2017

06 / 2017

Pilots

In the project, a significant 1 MW electricity storage was implemented in Finland, as well as an electricity-saving smart system installed in 19 different locations in 2019.

2019

2019

Production

Atria's Sun started solar electricity production in September of 2018. 

09 / 2018

09 / 2018

Solar park expansion

The construction of the expansion part of Atria's Sun started with earthmoving after the soil had been melted of ice and snow enough in May 2022. Solar panel installation started in August 2022.

05 / 2022

05 / 2022

05 / 2022

Commissioning the expansion of the power plant

The 5.0 megawatt expansion part of Atria's Sun was commissioned in March 2023. As a new technology, double-sided bi-facial solar panels were used in the park.

The extension part was built as a single park complex on the east side of the factory area.

With the expansion, Atria covers approximately 8% of its electricity consumption with emission-free solar electricity.

03 / 2023

03 / 2023

Construction of the expansion section

The construction of the expansion part of Atria Auringo started with earthworks after the soil had been sealed enough in May 2022. Solar panel installation started in August 2022.

05 / 2022

2019

Deploying the expansion of the power plant

The 5.0 Megawatt expansion part of Atrian Auringo was commissioned in March 2023. As a new technology, double-sided bi-facial solar panels were used in the park.

The extension part was built as a single park complex on the east side of the factory area.

With the expansion, Atria covers approximately 8% of its electricity consumption with emission-free solar electricity.

03 / 2023

2019

MORE INFORMATION

JUHO
LASONEN

Senior Project Manager